The console: end-to-end NES with CRT output, v0.2
Drafted 2026-09-02 as v0.1; amended and ratified by the director the same day. This version is operative. Every number here is either quoted from a stamped report in the family or marked authored; nothing authored gets quoted anywhere until a milestone replaces it with a measurement.
Changed from v0.1:
- The frame rate in section 0 is corrected: v0.1 paced at "60.0988 Hz", the exact conflation ntsc-crt's M0 report caught and the ratified v0.3 handoff pins apart. All three NES rates are now named.
- The PPU real-time figure in section 1 is corrected: v0.1's "10.74 M h/s" was the dot clock's edge rate, a unit no 2C02 report uses. In the unit every stamped 2C02 number is measured in (the master half-clock), real time is 42.95 M half-steps/s, 4x more. The P3 gate is restated in frame time so the unit cannot be confused again.
- The four open questions are resolved (section 6 is now the decision
record):
nes-busis its own repository; P3 measures a per-dot table-driven number first with the bit-slice designed now and built on a recorded shortfall; the N5 gate-3 ROM is the Micro Mages demo; the 2A03 die pages move after the ladder and the probes they would have hosted become N3 deliverables.
0. Definition of "functional"
The console is functional when all of the following hold at once, each with a number attached:
- An NROM (mapper 0) program boots from power-on through the reset vector with no intervention.
- The picture on screen is demodulated by ntsc-crt from a composite waveform the 2C02 ladder produced, never looked up from a palette.
- Both controllers work through the 74LS368 path, not a shortcut.
- Sound comes out of the 2A03 ladder's AD1/AD2 taps through the authored mixer, resampled to the host rate.
- Frames are paced at the source's own rate, per frame type: full
frames 29,531,250/491,381 = 60.09848 Hz, short frames 60.09915 Hz,
two-frame rendering-on average 39,375,000/655,171 = 60.09881 Hz
(the figure the literature rounds to "60.0988"). The three are the
rates ntsc-crt's
field_rates_exactalready pins separately; duplicates and drops are counted (ntsc-wasm already has this policy). - Every chip in the box is held to its rung 0 by a golden, and the whole box is held to a real capture from a real NES.
"Functional" does not mean every mapper, every test ROM, or every sprite-overflow corner. It means one honest path from the crystal to the phosphor.
1. Where the family stands (quoted)
| Part of the box | Repo | Status |
|---|---|---|
| 6502 core | 6502 + halfphi | rung 0 bit-exact on 1,725 nodes; rung 3 (v6502-micro) 39.0 M h/s, all 274 traces replay exactly (2026-08-31) |
| 2C02 | 2c02 | P0 and P1 closed 2026-09-02; 32,900 h/s rendering-on; DAC zero mismatches over 7,680 samples |
| Composite to phosphor | ntsc-crt | M0 through M5 closed; M4's real-recording half waits on one capture file |
| 2A03 wrapper (÷12, APU, DMA, strobes) | none | visual2A03 "responds 200; not fetched or measured" |
| Mainboard glue and cartridge | none |
Real-time needs, from the clocks on the schematic (21.477272 MHz master, ÷12 CPU): CPU 3.58 M half-cycles/s, against rung 3's measured 39.0 M, a 10.9x margin. The PPU's unit is the master half-clock (one half-step is one NTSC grid sample, 12 x f_sc, per the P1 report), so its real time is 42.95 M half-steps/s: one full frame is 714,736 half-steps in 16.639 ms. Stating the PPU requirement in any other unit is how v0.1 got it 4x wrong; milestone gates below use frame time, which no unit change can bend.
2. The shape
Three new repositories.
nes-bus: its own repository, likehalfphi, published and version-pinned. The frame types every chip crate speaks: CPU pins, PPU pins, the cartridge edge,DotFrame, and the audio sample stream. A crate insideneswould make the chip repos depend on the console repo, inverting the rule below;v6502-pins(one contract, no dependencies) andhalfphi(shared across repos, gate-checked) are the precedents. Resolves the PPU handoff's open question 2 (whereDotFramelives) by moving all the inter-chip contracts into one place at once.2a03: the fifth chip through halfphi. Rung 0 plus a ladder, exactly the 2c02 pattern.nes: the console. Owns the authored glue, the scheduler, the shell, and the end-to-end goldens. Depends onnes-bus,6502,2a03,2c02,ntsc-crt.
The rule that makes this work: a chip crate never knows what is on the other side of its pins. The console is the only thing that plugs anything into anything.
This document's committed home is nes-bus/docs until the nes
repository exists, at which point it moves there; the drafting copy in
the 6502 repository stays uncommitted, the same posture as the
ntsc-crt handoff copy.
3. Milestones
Each milestone has a gate that is a number, a MUTATE=1 that must go
red, and a check-self-counts.py row. Order is dependency order;
N1 and N2 can run in parallel.
N0: the contract
nes-buswithCpuPins,PpuPins,CartEdge(the 72 pins as a typed struct, the cartridge's outputs CIRAM_A10 and CIRAM_CE included),DotFrame(moved from ntsc-crt with a compatibility re-export),AudioSamples.- The cartridge is a trait; NROM is its first implementor and the only one in scope.
- Gate:
2c02andntsc-crtcompile againstnes-buswith their existing goldens unchanged.MUTATE=1flips one pin's polarity in the contract and every dependent golden must go red.
N1: 2A03 rung 0 (the 2a03 repo, milestones A0 to A3)
- A0: netlist fetched by pinned hash; counts asserted; power-on
converges; JSSim node golden bit-exact. First measurement to record:
whether the 2C02's 38 permanently-conducting supply-gated transistors
recur. If yes, promote the
power_onfix-up into halfphi. - A3: first sound: tap the AD1/AD2 driver nodes every half-step, hold the levels to the wiki's two-output mixer table sample for sample, stream to WebAudio.
- The new kind of gate: the core region held to
v6502-pinsthrough the rung 3 6502 in pin lockstep. Chip versus chip through the contract. Decimal instructions are the expected divergence and are listed by name. - The die pages v0.1 numbered A1 and A2 (the renderer with the 2A03
layout, the atlas and watch panel) move to after N3. The family has
never measured with a page: decimal-probe, reset-probe and
_block-probe.htmldid the measuring and the pages presented it. The instrumentation those pages would have carried is built as headless probes in N3, where the table measurement needs it; the pages come later, off the critical path, the same work as the 6502 page.
N2: PPU P2 and P3 (the 2c02 repo, as already written)
- P2: sprite-0, VBL race, OAM corruption, by crafted micro-trace.
- P3: the ladder. The gate is stated in frame time: one frame
rendered in at most 16.639 ms, the full-frame period, measured
over a stated number of frames with the margin recorded. The order
inside P3:
- Measure first: a per-dot table-driven stepper (a ladder rung is
not obliged to step at the half-step;
v6502-microhas no nodes, and a per-dot step does eight half-steps of work per step, which changes the arithmetic entirely). Record its frame time before any slicing work starts. - The bit-sliced datapath (the way
halfphi::slicealready works) is designed and budgeted now, in P3's plan, because the gap is large: authored expectation, if a naive half-step ladder reaches a tenth of the 6502's 1,465x it lands near 4.8 M half-steps/s against the 42.95 M real time needs, roughly 9x short. It is built only on a recorded shortfall from step 1, not on this authored number.
- Measure first: a per-dot table-driven stepper (a ladder rung is
not obliged to step at the half-step;
N3: 2A03 ladder
v2a03-micro:v6502-microfor the core (decimal disabled by flag, verified against N1's divergence list), plus the APU as tables measured out of rung 0 the way the 6502's decode was: frame sequencer, sweep, envelope, length table, noise LFSR, DMC. The $4014 and DMC stalls authored as RDY spans, replayed against rung 0 goldens that show which half-cycle the steal lands in.- The probes are deliverables, not scaffolding: headless dumps of the frame sequencer, channel timers and length counters, OUT0-2, OE1-2, and RDY during $4014, run against rung 0 before the tables are authored. These are the instruments the deferred die pages will later present.
- Gate: pin golden against rung 0 on a register program that exercises every channel; the AD1/AD2 sample stream bit-exact against rung 0's tap; throughput measured.
N4: the glue, authored
Nothing here goes through halfphi. Each part is a few lines held to its datasheet, labelled authored, with its own small test.
- 74LS139 half A: CPU_RAM_CS, PPU_CS from A13/A14.
- 74LS139 half B: ROMSEL = not (A15 and M2). The M2 term is the test.
- 74LS373: transparent on ALE high, latched on the falling edge. The test is a mapper-style A12 watcher seeing the right edge count.
- 2x TMM2115: ideal 2 KB SRAM. Access time recorded as a constant from the datasheet, unused until someone needs contention.
- 74LS368 x2 plus the diode arrays: the controller read path, including open bus on unused bits.
- 74HC04: PPU_!A13.
- The power-on reset chain: RST_PB, the CIC's reset output as a fixed delay (authored, replaced by the scope, see section 5).
N5: the console
- The scheduler: one master half-step counter at 21.477272 MHz ÷ 2, the CPU advancing every 12 master ticks and the PPU every 4, with the power-on alignment chosen from the set rung 0 produces and recorded in the run stamp. Wall-clock pacing is a separate layer, labelled authored, paced by the per-frame-type periods of section 0 item 5 with the ntsc-wasm drift policy.
- Gate 1: the CPU/PPU alignment. The NMI-during-BRK halfscore and the VBL race from P2 replay through the console with the same half-cycle positions as the standalone traces.
- Gate 2: blargg's
cpu_timing_test,ppu_vbl_nmi,sprite_hit_tests,apu_testend to end through the ladder rungs, each result recorded as pass or as a named, understood failure. - Gate 3: the Micro Mages demo (Morphcat Games) boots and plays
with both controllers: NROM 32K, co-op two-player, so "both
controllers" is exercised by actual play rather than a menu. It is
freely distributed but not open-licensed, so it drives the gate
locally and is never committed, the same posture as the manual in
reference/. Fallback if its licensing bothers anyone: Shiru's NROM titles (Lan Master), accepting that a second ROM is then needed for the second controller.
N6: the picture
DotFramefrom the PPU ladder into ntsc-crt's NES source, Rung C decode by default, the CRT stages on.- Gate: the M4 real-capture comparison against the scope recording from section 5, run on a colour-bars cartridge in both the real box and the console, with the same alignment procedure ntsc-oracle already uses. Tolerances stated before measuring.
N7: the sound
- AD1/AD2 sample streams into the authored mixer (R7, R8, R9, R6 and the RC constants off the schematic), then a resampler to 48 kHz.
- Gate: the scope's AUDIO_OUT recording of a known register program versus the console's, compared as waveforms after the same resampling. Tolerances stated before measuring.
N8: the shell and packaging
- A Linux native binary: the console, a window, the CRT stages in a shader (the one place the GPUs earn their keep), controller input, audio out. The die explorers stay in the browser; the console does not need them.
- The WASM build kept alive as a second target, measured separately.
4. What the two GPUs are for
Not the console. The measured GPU rung 2 runs 128,000 machines at 39 h/s each. They are for:
- The CRT shader in N8.
- Regression sweeps: every opcode from every seed on rung 0 kernels,
nightly, the way
v6502-gpualready runs. - Golden generation for N3 and N2 in parallel rather than serially.
5. The scope session
Everything below feeds a named gate. Capture in this order; the first item alone closes ntsc-crt M4.
| Probe point (schematic) | Rate needed | Feeds |
|---|---|---|
| VIDEO_OUT (AUX port, or the RF_MOD1 input, after Q1) | at least 4x subcarrier; 12x subcarrier (42.95 MSa/s) matches the grid exactly | ntsc-crt M4 real capture; N6 |
| X1 / CPU_CLK / PPU_CLK (the 21.477272 MHz master) together with M2 (U6 pin 31) and PPU_ALE (U5 pin 39) on one timebase | at least 100 MSa/s, 3 channels | the ÷12 versus ÷4 power-on alignment; N5 gate 1 |
| AUDIO_OUT (AUX port) and, if reachable, U6 pins 1 and 2 (AD1, AD2) | 1 MSa/s is plenty | N7; the mixer constants |
| ROMSEL at the cartridge edge against M2 | 100 MSa/s | N4's 139 half B test |
| CPU_RST, RST_PB, CIC_RST, PWR_LED at power-on | 1 MSa/s, long record | replaces the authored reset chain in N4 |
| CIRAM_CE and PPU_A13 against PPU_ALE | 100 MSa/s | the cartridge contract's mirroring path |
Notes for the session:
- Save raw samples with the sample rate and probe attenuation in the
filename or a sidecar.
ntsc-source-capreads WAV; the rest can be CSV. Nothing gets a name until it has a rate stamped. - Capture the master clock and M2 on the same record so the alignment is a measurement, not an inference from two records.
- For VIDEO_OUT, a colour-bars screen (any NROM test suite that draws bars) plus a plain black frame plus a plain white frame. Bars close M4; black and white pin the sync and blanking levels the DAC gate already holds.
- Do the power-on capture more than once. The alignment is expected to vary between power-ons; the set of values you see is the set N5's scheduler must draw from.
- Probe the composite after the video buffer, not at the PPU pin; the console models the buffer, and the comparison should be buffer-to-buffer.
6. Decision record
v0.1 put four questions to the director; all four are decided above and recorded here so the reasoning survives.
nes-busis its own repository (section 2). A crate insidenesinverts the dependency the whole shape exists to prevent.- P3 measures first, in frame time, with the slice designed now and built on a recorded shortfall (N2). The 4x unit correction in section 1 is what forced the gate into frame time; the authored gap is roughly 9x, large enough to design for, not large enough to build for unmeasured.
- Micro Mages demo for N5 gate 3 (N5). v0.1 cited "the original roster", which nothing in the family defines; the pick is made on criteria instead (mapper 0, both controllers in real play, distributable enough to test with, never committed).
- The 2A03 die pages come after the ladder (N1, N3). The probes they would have hosted are N3 deliverables; the pages are presentation and off the critical path.
Nothing is open for the director in this version.